About 54 oversized-load trucks will pass through Marysville with parts for the turbines being installed at Marshall Wind Farm under construction this winter southeast of Beattie.

The trucks — carrying tower portions, nacelles, blades and hubs — will go through here starting Friday as the farm’s first six turbines begin to be erected.